Design example: read existing pump-station meters

Keep useful installed meters and review how their documented readings reach the operations system.

What should the sample connection demonstrate?

Design example for equipment selection. Agree the connection, local-to-remote comparison and outage test with the panel and receiving-system owners.
ChoiceWhat to compareWhat to check
Meter readbackSelected registers decoded to the documented unitCompare with the local indication under an agreed condition
Pump statusAvailable run/fault meaning and timingVerify the actual contact or register definition
Lost communicationA visible stale or missing-data stateCheck restart and supported recovery on the chosen path
HandoverPoint list, settings and receiving-system ownerKeep configuration and access records with the installation

Useful for this connection

Equipment options for this application

Representative product-family photos. View specifications on sungeneiot.com; the quotation identifies the selected model.

What to send

  • Pump count, starter or VFD type, and whether a fault contact already exists.
  • Meter register map, baud rate and addresses if Modbus is already on site.
  • Destination system: existing water SCADA, MQTT broker, or not decided.

Technical references

Check the official protocol and radio specifications alongside the selected model’s documents and applicable certificates.

Send the pump house details.

Request a shortlist

Common questions

Will you replace our SCADA?

An existing SCADA or receiving platform can remain when its owner provides a compatible interface and approved access. Agree the point mapping, units, timestamps, missing-data handling and connection checks with that owner.