Powered remote sites
Review equipment for a powered irrigation water point
One powered water or irrigation site
Compare the level, pump-status or meter inputs at one powered tank, pump house or irrigation offtake.
Compare what you need us to deliver
| Scope | What the proposal covers | What is agreed before work |
|---|---|---|
| Equipment selection | Sensor, acquisition device, interfaces and accessories | Selected configuration, quantity and applicable documents |
| Field pilot | Named points and agreed checks before expansion | What is checked, local work, test record and remaining questions |
| Integration and handover | Receiving platform, mapped data and operational access | Account ownership, included work, service charges and support |
What we send back
- A shortlist for that water or irrigation site: sensor, RTU or serial path.
- Compare the sensor and gateway specifications for water and irrigation monitoring.
- What still has to be confirmed before a firm quotation.
If this is the site you have

Tank or basin
Compare the sensor installation and the route to your monitoring system for low-water and high-level information.

Pump or well
Review the signals available from the existing panel and decide whether the job also needs a separate water measurement.

Irrigation offtake
Use an existing powered cabinet to collect the water and pump signals that operators need between visits.
Related equipment
Send the sites. Get a hardware shortlist.
A work email helps, but is not required. Unknown quantity is fine. A cabinet, panel or site photo is the most useful attachment.
- How many tanks, pumps or cabinets.
- What you cannot see from the office today.
- Whether the cabinet already has power.
- Where the reading should arrive, if you know.
You can also email contact@sungeneiot.com. Same company as sungeneiot.com.
Common questions
What information is needed to choose sensors and gateways?
For water and irrigation sites with cabinet power, match the level sensor, pump signals and gateway to the existing control system.
What if the irrigation site has no mains?
Compare battery and solar monitoring configurations. Size the supply from the sensors, communication equipment, reporting interval and maintenance visits.